Suzhou Bank building
Suzhou Bank building in May 2009 laid the foundation stone, completed by the end of 2013. Building 100 meters high, a total of 25 layers (two floors underground), the entire building using water-cooled air conditioning unit cooling, pipe-intensive, leak detection products require high demand.
The project uses Xiang as a positioning leakage sensor line, accurate positioning of leaks, in April 2014 the successful acceptance, well received by users.